Helirig lift units onto Foreign Office roof in central London
On a crisp, clear winter’s morning Helirig lifted Air Handling Units and Condensers onto the rooftop of the Foreign and Commonwealth Office (FCO) in central London. 10 lifts with a maximum weight of 2,500kg were quickly completed inside 30 minutes. With no road closures and staff still able to access the building while work was underway, there was no disruption to London’s famous neighborhood. The Foreign […]
Read MoreBuilding a power line in Donegal, Ireland
Helirig were called to construct a vital link in a power line across Donegal in the Republic of Ireland. The designers relied largely on maps for the design of the line and unfortunately found one of the pole to be positioned on an inaccessibly steep escarpment. Helirig initially lifted concrete for the pole bases and on a second visit the poles were lifted into place. […]
Read More+44 (0)1635 813909